WAVE RenovationPlan Your Kitchen

WAVE HOMEOWNER GUIDE · NORTH METRO ATLANTA

Plan your kitchen.
Resolve the expensive decisions early.

A practical guide to scope, allowances, ordering and the steps to settle before demolition.

A kitchen remodel connects cabinetry, appliances, surfaces and building systems. Use this guide to organize the decisions, compare proposals and prepare for your first planning conversation.

STEP 1

Start with the problems the kitchen needs to solve

Write down where the current kitchen falls short: crowded preparation space, missing storage, poor lighting or a layout that separates the cook from everyone else. Rank those problems before choosing finishes. A larger island only helps if the room still supports circulation, appliance doors and seating.

  • Photograph each wall and the connections to adjacent rooms.
  • List what stays, including appliances, flooring or windows.
  • Identify who will approve the layout and final selections.

STEP 2

Compare the entire scope, not just the total

Two proposals can carry similar totals while covering different work. Review demolition, protection, disposal, cabinetry, countertops, installation, plumbing, electrical, flooring, paint and closeout. If a wall or appliance location changes, ask how that affects the connected trades. Identify permit and inspection responsibilities for your property before production.

  • Mark every inclusion, exclusion and owner-supplied item.
  • Confirm whether adjacent flooring, trim and paint repairs are included.
  • Ask how concealed conditions and additional work will be documented and authorized.

STEP 3

Make allowances comparable

An allowance is a budget provision for a selection that is not fully resolved. It needs enough detail to show what the number actually buys. Record the quantity, product assumptions and whether tax, delivery and installation are included. Ask how an amount above or below the allowance changes the contract total, including any applicable markup.

  • Cabinets: layout, construction, finish, storage accessories and installation.
  • Countertops: material, edge, backsplash, cutouts, removal and template requirements.
  • Fixtures and appliances: exact model, procurement responsibility and installation scope.

STEP 4

Confirm product details before ordering

Cabinet dimensions, appliance specifications, sink configuration and ventilation plans affect one another. Resolve them together. A refrigerator model change can affect cabinet openings; a sink change can affect the sink base, countertop cutout and plumbing. Ask who verifies measurements and product compatibility before orders are released.

  • Collect appliance specification sheets and installation requirements.
  • Approve the cabinet layout, finish and hardware in writing.
  • Confirm sink, faucet, lighting and backsplash selections with the team.

STEP 5

Build the sequence around confirmed milestones

A requested delivery date is different from a confirmed delivery. Ask which materials need to be received and inspected before demolition. Cabinet installation, countertop templating, fabrication and final plumbing are separate steps; understand their dependencies rather than treating them as one installation day. The schedule should identify decisions and deliveries that could move later work.

  • Record who orders, receives, inspects and stores each item.
  • Discuss the response to damaged, missing or delayed materials.
  • Agree on when progress updates and schedule changes will be communicated.

STEP 6

Plan for daily life and final closeout

Decide where meals, dishes, pets and everyday household traffic will go while the kitchen is unavailable. Confirm access, dust protection, retained-finish protection and cleanup expectations. At the end, walk the kitchen against the written scope, record remaining items and collect product-care information and applicable warranty documents.

  • Set up a temporary food-preparation area before demolition.
  • Keep selection approvals, changes and progress updates together.
  • Agree on a written punch list and responsibility for completing each item.

Bring these details to WAVE

Share your property location, photos, the layout changes you are considering, appliance plans, investment range and preferred timing. Include any drawings or existing estimates. You can start the conversation while selections are still open.